Mid-range HPC Cluster, 32 dual-core AMD nodes, InfiniBand
|
|
||||||||||||||||||||||||||||
![]() |
Hardware equipment |
![]() |
![]() |
Services |
![]() |
![]() |
Diagram |
![]() |
A master node with the following features:
transtec CALLEO 314L
- Two AMD Opteron F 2216 (2.4 GHz) CPUs, NVIDIA nForce MCP55 Pro chipset
- 4GB ECC DDR-RAM
- Floppy + double-layer DVD-R drives
- 3 x 500 GB hot-swappable SATA II system disk in RAID 5 array
- 3ware 9650SX-8LPB RAID controller, incl. BBU
- 2 free hot-swappable drive bays
- Redundant 800 Watt power supply pack
- 4 U
32 compute nodes with the following features:
transtec CALLEO 211L
- Two AMD Opteron F 2216 (2.4 GHz) CPUs
- NVIDIA nForce Professional 2200 chipset
- 4 GB ECC DDR2-SDRAM (max. 16 GB, 8 DIMMs)
- 80 GB hot-swappable SATA II hard disk drive (max. two hard disk drives)
- Mellanox InfiniHost single-port 4X, low-profile HCA card
- Onboard dual 10/100/1000BASE-T Gigabit Ethernet
- 1 U
- 500 Watt power supply pack
Software, accessories and service:
- Two Mellanox InfiniScale 2400 Switches, 24-Port copper, cascaded
- Infiniband cable, 4X by 4X, 2 metres
- One Gigabit switch with 48 x 10/100/1000BASE-T (RJ45) and suitable cabling for server access
- All equipment installed in a transtec 19" (42 U) chassis
- Including HPC software installation and three-year warranty on the hardware
- Turnkey system incl. queuing system, parallel libraries and management software
- Includes delivery, on-site installation and training
Performance and power characteristics in detail:
- Peak Performance per compute node approx. 19.2 GFlops / over-all approx. 614 GFlops
- Power Usage over-all approx. 13.2 kW / 4 x 230V / 32 A
- Heat emission approx. 45000 BTU/h
- 64 CPUs / 128 cores in cluster
- 42 U rack, 600 mm wide, 1000 mm deep, 2100 mm high
- Total number of used rack units: 39 (3 U free)
- Total weight approx. 830 kg
Optional extended solutions
INS-HPC-HAC
2.230,00 GBP
Redundant Masternode for transtec HPC Cluster
INS-HPC-REC
915,00 GBP
Disaster Recovery DVD for HPC-Cluster Masternode
INS-HPC-TRA
915,00 GBP
trainingday how to use an transtec HPC-Cluster




